From: route@monster.com
Sent: Thursday, April 07, 2016 11:48 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: p6 Scheduler
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Eric Piña 4601 Forest Dr.
#902
(915) 926-6302 Carlsbad,
NM 88220
enpina@gmail.com Objective
Seeking a Project Scheduler position which will enable me to utilize my
knowledge and experience with Primavera P6 Software, in order to complete a
Level 4 Master Schedule with built-in logic. Education
University of Texas at El Paso (UTEP) Business Administration in Management
Student
Overall
GPA:
3.0/4.0
Major
GPA:
3.25/4.0 Skills
Organization ·
Built and Maintained and Level 1thru
Level 3 schedule for the HB Project, which displayed all areas including:
Milestones, Engineering, Procurement, Construction, and Commissioning. ·
Managed over 500 deliveries as Material
Manager for the HB Solar Solution Project ·
Planned and organized pre-construction
meetings with various departments within Texas Tech University Health Science
Center. ·
Managed various subcontractors on
multiple projects Texas Tech Health Science Center, The U.S. Government, and
The City of El Paso. Communication ·
Created a Level 3 Master Schedule,
including an organized WBS, built-in logic, assigned filters, and activity
codes which allowed be to manipulate the schedule for proper reporting. ·
As Materials Manager, I managed all
equipment received which allowed me to relay to our contractors when, where,
and location of materials received. ·
Created written and verbal
communication to the Facilities and Maintenance Director, as well as
maintenance department at Texas Tech. ·
Maintained verbal communication with
the end user of the projects including: Fort Bliss, and Texas Tech
Health Science Center ·
Informed department personnel at Texas
Tech on present and future projects being held in their respective department
including: Ophthalmology & Internal Medicine. Technical ·
Computer
Programs:
Primavera P6 v.7.0, Certified in Primavera P6 v.6.2, Certified
in Advanced Primavera P6 v. 6.2, Microsoft Project 2007, Windows 2007, Excel,
Access, Power Point, Windows XP, RS Means Software, Internet Explorer,
Outlook ·
OSHA (10), MSHA (Surface &
Nonmetal) Construction Experience
SM Stoller Corporation
Carlsbad, NM Project Controls III-
Project Scheduler/ Materials
Manager
02/2012-
Present
HB Solar Solution Mining Project
(Intrepid Potash)- Estimated
Project Value: $245 Million Created and managed the Level 3
Master Schedule via Primavera P6 v. 7.0, for the HB Solar Solution Mining
Project located in Carlsbad, New Mexico. Maintained the schedule and
reported to upper management (AMEC) on weekly and monthly status
updates. All materials specific to the HB Solution Mining Project were
properly received, accounted for, and checked according to
specification. As Material Manager, materials were received, inventoried,
tracked, performed quality-checks, and completed transfer-of-custody forms
for the respective contractors. Martinez Bros.
Contractors, LLC
El Paso, TX
Project
Management
12/2010- 01/2012 UTEP Swimming & Fitness Center
(UTEP)- Estimated Project
Value: $173,783 As Project Manager, I created and implemented the
landscape and irrigation schedule. Scope of work included mainline
installation, and landscaping. I coordinated all field efforts in order
to complete our scope of work for the General Contractor, VCC Construction.
This included RFI's, subcontractor's meeting, change orders, Quality
Assurance, and Closeout Documentation. Cab Hot Refuel Facility (US
Government)- Estimated
Project Value: $109,000 As Project Manager, I dealt with General
Contractor Sundt Construction and Army Corps of Engineers. Scope of
work included Hydroseeding, Straw Blowing, and crimping of 14 acres of
land. This project also included Pay Applications, quality control, and
material ordering. Expansion Parcel J (US Governemnt)- Estimated Project Value:
$727,225 As project Manager, I managed all aspects for the installation
of landscape and irrigation for 49 Military Housing Units inside Fort Bliss,
TX. I coordinated with Balfour Beatty Construction, in order to
complete the project on time and within budget. Scope of work
included: Irrigation, landscape, SOD, tree, plant, and aggregate
installation.
SDVO Constructors, LP
El Paso, TX
Project
Controls
05/09- 05/10 Fort Bliss IDIQ Building 746 (US
Government)- Estimated Project
Value: $768,000 As project Controls, I coordinated the field operations
for the construction renovation at Building 746. This included all
RFI’s, payment applications, change order processes, and site visits.
This project included steel erection, Crane installation, electrical,
mechanical, plumbing, HVAC, tile work, and cement work. Quail Park Office Condominiums (Karam
Co.)- Estimated Project
Value: $787,000 Throughout this project I coordinated with all the
subcontractors in efforts to work simultaneously, to install utility
infrastructure. This utility infrastructure included: waterline
installation, storm drain installation, sewage installation, electrical, gas
line installation, curb & gutter, irrigation, grading, and paving. El Paso County 911 Call Center (City
of El Paso)- Estimated Project
Value: $86,000 As project controls I was able to communicate with
department heads and subcontractors to complete the project on-time.
This project included: wall erection, texture & paint, electrical,
carpet installation, doors & hardware, and mechanical/HVAC. Basic IDIQ,
Inc.
El Paso, TX Superintendent
11/06-05/09 Texas Tech
University Health Science Center- Medical Education Building (MEB) Estimated Project Value: $60,000-
As a Superintendent, I coordinated the renovation of an open area into a full
size classroom. This included the installation of studwork, drywall,
painting, electrical, re-routing of CAT-5e cable, and doors &
hardware. This also included the addition of an open area into an
administrative office. This included carpentry, electrical, glass &
glazing, doors & hardware, and drywall installation. Throughout the
project, I submitted necessary documents including submittals, as-builts, and
maintained communication with Texas Tech officials. Texas Tech University Health Science
Center- Lobbies and Hallways Estimated Project Value: $550,000-
The scope of work included providing new walls throughout the entire lobby
and hallway area. We demolished carpeting and added 2’X2’ tiling
throughout. We added a fabricated hand rail along the hallway walls. Texas Tech University School of
Medicine- Medical Science Building 1(MSB1) Estimated Project Value: $130,000-
Modified (3) three air handlers by treating the water, adding demister pads
and frames, and modifying the boilers to a lead-lag system. This
project cut Texas Tech’s energy costs in half. Personal References (Construction) Dustin Small (1 ½
years)
AMEC Construction
Manager
(575) 706-3956 Dustin.small@amec.com Don Wassmuth (1 ½
years)
Intrepid Potash Project
Manager
(575 499-3032 Don.wassmuth@intrepidpotash.com Eddie Linns (13 years)
Basic IDIQ,
Inc.
Senior Project
Manager
(915) 757-6875 Eddie.linss@basicidiq.com
Eddie Martinez (1
year)
Martinez Bros. Contractors, LLC President/
Owner
(915) 584-3900 Eddie.martinez@martinezbros.com |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
Spanish |
Advanced |
|
|
|